CLEAN Linen Services Interview Questions, Process, and Tips

Ques:- Assume that passwords are selected from four-character combinations of 26 alphabetic characters. Assume that an adversary is able to attempt passwords at a rate of one persecond.a) Assuming no feedback to the adversary until each attempt has been completed, what is the expected time to discover the correct password?
Ques:- The number obtained by interchanging the two digits of a two-digit number is less than the original number by 45. If the sum of the two digits of the number so obtained is 13, then what is the original number?
Recent Answer : Added by keerthivasan On 2022-05-17 08:54:07:

let (xy) be original number.
then, 10y + x +45 = 10x + y; eq 1
and x + y = 13; eq 2
solve ab equation,
then xy = 94;

Ques:- What i ask about myself in interview ?
Ques:- There are three people A, B, C. Liars are of same type and Truth speaking people are of same type. Find out who is speaking truth and who is speaking false from the following statements:
A. A says: B is a liar.
B. B says: A and C are of same type.
Recent Answer : Added by Koshti bhavna On 2021-03-19 17:07:56:

B

Ques:- How to introduce ourself
Ques:- What was your last experience tell me about this?
Ques:- If 1/x = 3.5. then 1/(x+2) =
Ques:- What is your Favourite color
Ques:- consider expresion ‘ab’ . what happens when ‘a’ is divided by ‘c’ & ‘b’ is multiplied by ‘c’.
Recent Answer : Added by tsion On 2022-03-19 16:02:17:

exactly

Ques:- A man bought 20 shares of Rs. 50 at a discount of 5, the rate of dividend being 13. The rate of interest obtained is?
Recent Answer : Added by arjun On 2021-12-09 18:40:07:

15%

Ques:- the ratio of white balls to black balls is 1:2. if 9 balls are added then the ratio of the balls become 2:4:3. find the number of black balls.
A. 12
B. 6
C. 9
D. none
Recent Answer : Added by Admin On 2020-05-17 12:04:25:

these are question tht are seem to be like it consumes
time. so dont see jus the question and run to the next .
ans. a) 12
if 9 balls are added then the ratio to the combination
becomes 2:4:3.
9 balls make the ratio 3 for grey balls in tht mixture.
so the factor is 9/3 = 3 (in tht mixture)
so the same factor has to be maintained through out the
ratio. so black balls is 4 * 3 = 12 and white balls is 2 *
3 = 6.

Ques:- Qualification and Academic Details
Ques:- Will you be able to do the night shifts?
Ques:- What was the best achievement you had so far?
Ques:- How will you prove to be an asset to this organization?
Ques:- If you had enough money to retire right now, would you?
Recent Answer : Added by Kavitha G On 2023-06-08 11:06:40:

Money will give Luxury but not experience

Ques:- What is the difference between aim & objectives?
Ques:- Find out the wrong number in the series:
6, 12, 48, 100, 384, 768, 3072
A. 48
B. 100
C. 384
D. 768
Recent Answer : Added by narendra On 2022-09-22 16:43:05:

B. 100

Ques:- There are 3 baskets. one of them have apples, one has oranges only and the other has mixture of apples and oranges. The labels on their baskets always lie. (i.e. if the label says oranges, you are sure that it doesn’t have oranges only,it could be a mixture) The task is to pick one basket and pick only one fruit from it and then correctly label all the three baskets.
Recent Answer : Added by Admin On 2020-05-17 12:01:30:

Take one fruit from box with label mixture. If we see
orange, because the basket lies (it cant have a mixture),
then it has only oranges. The other 2 are labeled apples and
oranges. The one labeled apples,
cannot have oranges inside, cos they are allready been
identified, and because it lies, it cannot have apples either.
So it has a mixture. And we are left with the one labeled
oranges that lies and has apples.

Ques:- The speed of a boat in still water in 15 km/hr and the rate of current is 3 km/hr. The distance travelled downstream in 12 minutes is:
Recent Answer : Added by Blessy On 2022-08-14 16:45:57:

3*12=36

Ques:- a man travels by walking 4 kmph to a certain distance followed by 3 kmph upstream a hill and returns at 6 kmph hill downstream and walks the same 4 kmph in flat and returns home. if the total time taken is 6 hrs wht is the total distance ?
A. 24
B. 12
C. 22.5
D. none of these
Recent Answer : Added by Dennis On 2020-07-16 14:50:37:

The ratio flat vs hill is unknown so you can’t calculate this normally. But since the average for uphill/downhill is also 4 kmph ((1.5h)/6km)), the calculation is: 6 hours * 4kmph = 24km.

Ques:- What is your contribution of the Branch?
Recent Answer : Added by Pallavi On 2022-04-02 06:59:53:

Very great things your doing

Ques:- A train travelling at a speed of 90 km/hr, crosses a pole in 10 seconds. The length of the train is
A. 100 m
B. 150 m
C. 250 m
D. 900 m
Recent Answer : Added by vineet kumar On 2022-08-14 16:44:48:

Train speed 90 km /h
1st we have to change in m/s. then 90*5/18=25m/s
Then d=speed*time
=25*10=250m train length

Ques:- What is black money?
Ques:- Which among the following countries has joined World Trade Organisation as the 153rd member
Ques:- WHY U GOING TO CHANGE JOB AFTER LONG TIME? WHY ARE WAIT THREE YEAR TO CHANGE JOB?
Ques:- Can you talk about your life in a summary?
Ques:- What do you dislike about the college you studied?
Ques:- How well you work with a team?
Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:

To solve this problem, we can break it down into steps:

Step 1: Determine the individual rates of work for A, B, and C.

If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.

Step 2: Calculate the combined work rate of A and B.

If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.

Step 3: Calculate the time it takes for B to complete 75% of the task.

Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.

Step 4: Calculate the remaining work for C.

If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.

Step 5: Calculate the time it takes for C to complete the remaining work.

Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.

Step 6: Calculate the total time required.

A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.

Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top