B
exactly
15%
these are question tht are seem to be like it consumes
time. so dont see jus the question and run to the next .
ans. a) 12
if 9 balls are added then the ratio to the combination
becomes 2:4:3.
9 balls make the ratio 3 for grey balls in tht mixture.
so the factor is 9/3 = 3 (in tht mixture)
so the same factor has to be maintained through out the
ratio. so black balls is 4 * 3 = 12 and white balls is 2 *
3 = 6.
Money will give Luxury but not experience
6, 12, 48, 100, 384, 768, 3072
B. 100
Take one fruit from box with label mixture. If we see
orange, because the basket lies (it cant have a mixture),
then it has only oranges. The other 2 are labeled apples and
oranges. The one labeled apples,
cannot have oranges inside, cos they are allready been
identified, and because it lies, it cannot have apples either.
So it has a mixture. And we are left with the one labeled
oranges that lies and has apples.
3*12=36
The ratio flat vs hill is unknown so you can’t calculate this normally. But since the average for uphill/downhill is also 4 kmph ((1.5h)/6km)), the calculation is: 6 hours * 4kmph = 24km.
Very great things your doing
Train speed 90 km /h
1st we have to change in m/s. then 90*5/18=25m/s
Then d=speed*time
=25*10=250m train length
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
let (xy) be original number.
then, 10y + x +45 = 10x + y; eq 1
and x + y = 13; eq 2
solve ab equation,
then xy = 94;