Bioanalytical technologies, pune Interview Questions, Process, and Tips

Ques:- The number of prime numbers between 0 and 50 is
A. 14
B. 15
C. 16
D. 17
Recent Answer : Added by narendra On 2022-09-18 09:02:10:

b

Ques:- If x/y=4 and y is not '0' what % of x is 2x-y(a)150%(b)175%(c)200%(d)250%
Ques:- A power unit is there by the bank of the river of 750 mtrs wide. A cable is made from power unit to power plant opposite to tht of the river and 1500 mtrs away from the power unit. the cost of cable above water and below water is Rs12 and Rs 15. Find the total cost for cable laying ?
Recent Answer : Added by Admin On 2020-05-17 12:04:06:

if rs 12 and rs 15 per meter then 750*12+750*15

Ques:- If a man can cover 12 metres in one second, how many kilometres can he cover in 3 hours 45 minutes?
Recent Answer : Added by Sohini Mitra On 2022-09-02 17:02:39:

3hour 45 min = 13500 sec
In 1 sec he covers = 12 m
In 13500 sec he covers = 12×13500 m = (12×13500)/1000 km = 162 km

Ans : 162 km

Ques:- Evaluate the greatest number of five digits which is divisible by 32, 36, 40, 42 and 48?
Recent Answer : Added by Admin On 2022-09-30 08:14:07:

answer= 90720

Ques:- A girl has 55 marbles. She arranges them in n rows. The nth row consists of n marbles, the (n-1)th row consists of (n-1) marbles and so on. What are the number of marbles in nth row?
Recent Answer : Added by DK BOSS On 2021-07-21 15:26:01:

answer 10

Ques:- What about past experience in non revenue products ?
Ques:- Ramesh can finish a work in 20 days and Sushil in 25 days. They both work together for 5 days and then Sushil goes away. In how many days will Ramesh complete the remaining work?
Recent Answer : Added by DK BOSS On 2021-07-17 10:05:29:

Answer:
11 days.

Step-by-step explanation:
In the question,

Time taken by Ramesh to finish a piece of work = 20 days

Time taken by Sushil to finish a work = 25 days

Time for which they worked together = 5 days

Sushil left after = 5 days

So,

One day work of Ramesh is,

One day work of Sushil is,

So,

Work done in 5 days is given by,

Therefore, Remaining work is given by,

Now, as the Sushil left the remaining work was done by Ramesh,

Time taken by Ramesh for the remaining work is,

Therefore, the remaining work will be completed in 11 days by Ramesh.

Ques:- If MADRAS can be written as ARSARS, how can ARKONAM be written in that code ?
Ques:- Your interested in fmcg but why do you choose insurance sector
Ques:- Introduce my self
Ques:- How many hours a week you want to work?
Ques:- The length of a train and that of a platform are equal. If with a speed of 90 k/hr, the train crosses the platform in one minute, then the length of the train (in meters) is:
Ques:- 8.008 + 0.8 + 80.8 + 800.8 + 0.08 = ?
Recent Answer : Added by rahul kumar chaurasiya On 2022-05-17 08:56:41:

890.488

Ques:- Let S be the set of prime numbers greater than or equal to 2 and less than 100. Multiply all the elements of S. With how many consecutive zeros will the product end?
A. 1
B. 4
C. 5
D. 10
Recent Answer : Added by Yash G On 2023-03-01 17:24:09:

To determine how many consecutive zeros the product of S will end with, we need to find the highest power of 10 that divides the product. This is equivalent to finding the highest power of 5 that divides the product, since the number of factors of 2 will always be greater than the number of factors of 5.

The primes in S are {2, 3, 5, 7, 11, 13, 17, 19, 23, 29, 31, 37, 41, 43, 47, 53, 59, 61, 67, 71, 73, 79, 83, 89, 97}.

There are 24 primes in S, so the product of S is:

2 x 3 x 5 x 7 x 11 x 13 x 17 x 19 x 23 x 29 x 31 x 37 x 41 x 43 x 47 x 53 x 59 x 61 x 67 x 71 x 73 x 79 x 83 x 89 x 97

We need to find the highest power of 5 that divides this product. To do this, we count the number of factors of 5 in the prime factorization of each number in S.

5 appears once: 5
5 appears once: 25
5 appears once: 35
5 appears once: 55
5 appears once: 65
5 appears once: 85
So, there are six factors of 5 in the product of S. However, we also need to consider the powers of 5 that arise from the factors 25, 35, 55, and 65.

25 = 5 x 5 appears once: 25
35 = 5 x 7 appears once: 35
55 = 5 x 11 appears once: 55
65 = 5 x 13 appears once: 65
Each of these numbers contributes an additional factor of 5 to the product of S. Therefore, there are 6 + 4 = 10 factors of 5 in the product of S.

Since each factor of 5 corresponds to a factor of 10, we know that the product of S will end with 10 zeros. Therefore, the product of S will end with 10 consecutive zeros

Ques:- A rectangular field has area equal to 150 sq m and perimeter 50 m. Its length and breadth must be?
Recent Answer : Added by polo On 2020-11-19 16:12:30:

b=15,l=10 or b=10,l=15

Ques:- Why are you interested in my company?
Ques:- What types of math do you use? Re: Calculus, Algebra, Fractions?
Ques:- The age of father 10 years ago was thrice the age of his son. Ten years hence, father’s age was five times the age of the son. After 6 years, son’s age will be:
Ques:- Subject knowledge, describe about the self.
Ques:- What are the soft skills training?
Ques:- How to achieve growth in marketing?
Ques:- About yourself, why to join onmobile, why mba after B.tech, 3 achievements and setbacks of ur life etc
Ques:- I don’t know
Ques:- Amar takes as much time in running 18 meters as a car takes in covering 48 meters. What will be the distance covered by Amar during the time the car covers 1.6 km?
Recent Answer : Added by DK BOSS On 2021-07-17 06:22:55:

Answer: 600m

Explanation:

Distance covered by Amar = 18/4.8 (1.6km) = 3/8(1600) = 600 m

Ques:- Anita, Indu and Geeta can do a piece of work in 18 days, 27 days and 36 days respectively. They start working together. After working for 4 days. Anita goes away and Indu leaves 7 days before the work is finished. Only Geeta remains at work from beginning to end. In how many days was the whole work done?
Recent Answer : Added by Ax On 2021-04-09 17:38:12:

4.224 days

Ques:- A company contracts to paint 3 houses. Mr.Brown can paint a house in 6 days while Mr.Black would take 8 days and Mr.Blue 12 days. After 8 days Mr.Brown goes on vacation and Mr. Black begins to work for a period of 6 days. How many days will it take Mr.Blue to complete the contract?
Recent Answer : Added by mohammed shahnawz On 2022-08-14 16:45:52:

mr, blue was compplete the contract in 12 days

Ques:- How would you manage two projects that require your time?
Ques:- If you were given a box of pencils, list 10 things you could do with them that are not their traditional use?
Ques:- If the product has fail can you sell that to customer?

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top