20
Business Process Outsourcing, or BPO, refers to the process of contracting standard business functions to be handled by a party outside of the company.
BPO is the abbreviation for business process outsourcing, which refers to when companies outsource business processes to a third-party (external) company.
Nice
Here is the solution to the given version of the puzzle (9 balls, one is heavier, need to identify oddball), where we label the balls A, B, …, I:
1. Weigh ABC versus DEF.
Scenario a: If these (1) balance, then we know the oddball is one of G, H, I.
2. Weigh G versus H.
Scenario a.i: If these (2) balance, the oddball is I.
Scenario a.ii: If these (2) do not balance, the heavier one is the oddball.
Scenario b: If these (1) do not balance, then the oddball is on the heavier side. For simplicity, assume the ABC side is heavier, so the oddball is one of A, B, C.
2. Weigh A versus B.
Scenario b.i: If these (2) balance, the oddball is C.
Scenario b.ii: If these (2) do not balance, the heavier one is the oddball.
answer is maximum of 2.
Answer: Option C two
but how?
(130+x)/30=(45×5/18)
245 meters
64
Speed Ratio = 1:7/6 = 6:7
Time Ratio = 7:6
1 ——– 7
4 ——— ? 28 m
If discount is 25%
Profit 25%
If discount10%
Profit?
Suppose 100rs is price
25% discount make it 75
25%profit that means 75×100/125=60
Cp is 60
10 % discount make sp 90 profit is 30%
let present age of ANAND AND BALA BE( A AND B ) RESPECTIVELY
A.T.Q
(A-10) = 1/3[B-10]. ……… – {1}
given
B = A+ 12 PUTTING IN 1
THEREFORE A-10 = 1/3 (A+2) = A+2 = 3A – 30
2A =32
A=16
100 steps(1step/sec)
190, 166, 145, 128, 112, 100, 91
128 is incorrect. There is a difference of multiples of 3 in the number pattern, which starts at 24 and reduces by 3 each time. Therefore the correct pattern would read 190, 166, 145, 127, 112, 100, 91.
this would leave the pattern with differences in the pattern 24, 21, 18, 15, 12, 9. The next number in the pattern would be 6 lower than 91. 91 – 6 = 85. Then 85 -3 – 82, followed by 82 – 0 = 82. After this, if -3 were taken the pattern would start to rise so 82 – – 3 = 85.
5/9
B.25
3.14