I will first need to understand why he/she behaves so to establish the exact cause and try persuade him to appreciate roles and responsibilities of the various Team members in trying to achieve organizational goals.
This is a sequence of English letters, in numbers.
⇒ ten = 3 letters
⇒ nine = 4 letters
⇒ sixty = 5 letters
⇒ ninety = 6 letters
⇒ seventy = 7 letters
⇒ Sixty six =8 letters
⭕️This logical question goes with the no. of letters in the number!!!!!!!
⭕️∴ the biggest number with 9 letters will be ninety-six (96).
Answer is 8,12,5,20
8+2=10
12-2=10
5*2=10
20/10=10
500
When A runs 1000 meters, B runs 900 meters and when B runs 800 meters, C runs 700 meters.
Therefore, when B runs 900 meters, the distance that C runs = (900 x 700)/800 = 6300/8 = 787.5 meters.
So, in a race of 1000 meters, A beats C by (1000 – 787.5) = 212.5 meters to C.
So, in a race of 600 meters, the number of meters by Which A beats C = (600 x 212.5)/1000 = 127.5 meters.
9 years
Bcz 3×3=9
5×3=15
7×3=21
Total = 45
Avg of this 45/3 = 15
mother
42m
the answer is 3:10
explanation:
let the first number be x
and the second number be y
(7/8)((3/7)x)=(25/100)((45/100)y) given
ie.., 21x/56= 9y/80
on solving we get x:y= 3:10
is the answer
1km = 1000m
Xkm = 300m
X=0.30km
1hr = 3,600s
X = 40.5s
0.01125hr
Therefore; 0.3km/0.1125hr= 26.6666=26.67km/hr
Let 10’splace digit is x and unit’s place digit y
First milestone : 10x+y
Second milestone : 10y+x
Third milestone: 100x+y
Since the speed is uniform so
Distance covered in first Hr = Distance covered in Second Hr
(10y+x)-(10x+y) = (100x+y)-(10y+x)
After solving, we get —-> y=6x but since x and y are digits so only possible combination is x=1 and y=6,
So average speed = 45 KM/HR
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
24 days
4) QEOKTWG
consider the tank capacity as 90 litres.
to fill the tank in 3 hrs first pipe must flow at a rate of 30 litres/hr
2nd pipe has to flow at a rate of 45 litres/hr
if two pipes are opened at a time the flow rate will become 75 litres/hr
90/75= 6/5 = 1.2= (i.e) 1hr and 12 minutes 1 1/5 hr