One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
33.6
answer is one
cost price(c.p) of one fruit = 24/16
(c.p) = Rs 1.50
selling price(s.p) of one fruit = 18/8
(s.p) =Rs 2.25
profit for one fruit = 2.25 – 1.50 = 0.75
profit
profit % = ———– * 100
cost price
0.75
= ——- * 100
1.50
= 50%
answer can be 1,2,3,4 can’t be determined exact number
just explaining a case:
there are 10 people in the party.
name of people no. of people with they made handshake list of those people(this can vary but showing the possibility)
1 1 9
2 2 8, 9
3 3 7, 8, 9
4 4 6, 7, 8, 9
5 5 6, 7, 8, 9. 10
6 6 4, 5, 7, 8, 9, 10
7 7 3, 4, 5, 6, 8, 9, 10
8 8 2, 3, 4, 5, 6, 7, 9, 10
9 9 1, 2, 3, 4, 5, 6, 7, 8, 10
10 4 5, 6, 7, 8, 9
jack got 9 different answer so jack can be either 4th number or 10th number and jack’s wife know jack very well so she can’t have handshake with jack so if 4th is jack then she can’t be handshake with 6,7,8,9, in this case she can be 1,2,3, 5, 10 and now depending upon which no is jack’s wife she can have hand shake with- 1- 4 people, and if jack is number 10 then she can’t be 5,6,7,8,9 so again depending upon her number she can handshake with people in range of 1-4
underroot(1-r^2)/3
1>=y>x => y belongs to (-infinity,1]
x belongs to (-infinity,y)
if both x and y are negitive z can be greater than zero and
can be greater than y(1 and 4 are true)
if y equals 1 then x can be equal to z(2 is true)
therefore y=z is not true for any value of x and y
2x+x+2x+x = 300m
6x = 300
x = 300/6 = 50m
50m x 100m = 5,000 m2
Answer is 16
1,2,4,7,11,….
1+(1) =2
2+(2) =4
4+(3) =7
7+(4) =11
Therefore
11+(5) =16
C